大跨度预应力混凝土梁桥挠度控制研究市政工程专业论文.docxVIP

大跨度预应力混凝土梁桥挠度控制研究市政工程专业论文.docx

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
大跨度预应力混凝土梁桥挠度控制研究市政工程专业论文

Study Study on Deflection Control of Large—span Prestressed Concrete Girder Bridges ABSTRACT This paper mainly surrounded the excessive midspan lag which was a main problem of large-span prestressed concrete girder bridges at present,make a brief summary of the survey of development,characteristics and common diseases of large—span prestressed concrete girder bridges at first;this was followed by the comparisons of structure characteristics,internal forces and vertical displacement of different long-span prestressed concrete girder bridges and the analyses of inherent laws among those factors,which aimed at three different long-span continuous beam and continuous rigid frame bridges;then prestress,selfweight of structure,box girder rigidity,concrete creep and shrinkage,first time loading age of box girder segments and combined effect of multiple factors were studied to compare their influences on deflection,and then summarized various possible causes of excessive vertical displacement especially long-term excessive vertical displacement of large-span prestressed concrete girder bridges;finally focused on the study of deflection control programs which using top slab tendons,bottom slab tendons,reducing selfweight of the upper structure or using cables,as well as combining programs based on the above—mentioned deflection control programs, with a hope to offer reasonable proposals for the design and construction of those bridges. KEY WORDS: large—span girder bridge,deflection control,top slab tendons, bottom slab tendons,dead 10ads, cables II 插图清单图1.1 插图清单 图1.1 悬臂浇筑施工法 ..2 图1.2 悬臂拼装施工法 2 图1.3 广西柳州大桥 3 图1.4 重庆长江大桥(T形刚构公路桥) .3 图1.5 虎门大桥辅航道桥主跨跨中桥面挠度变化速率图 8 图1.6 汾江大桥、潭州大桥的下挠时间曲线 8 图1.7 科罗·巴岛桥倒塌后 一9 图1.8 底板分层劈裂事故

您可能关注的文档

文档评论(0)

131****9843 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档