甘肃路桥建设集团有限公司 兰州至永靖一级公路第五合同段施工组织设计
PAGE \* MERGEFORMAT 12
目 录
前言
Ⅰ、编制说明··············································10
Ⅰ-1编制依据···········································11
Ⅰ-2编制原则············································11
Ⅱ、工程概况··············································11
Ⅱ-1本项目概况及主要工程内容····························11
Ⅱ-2 施工工期···········································12
Ⅱ-3设计标准及技术标准··································13
Ⅱ-4 地形地貌、气象与水文等特征··························13
Ⅱ-5工程地质条件········································14
Ⅱ-6不良地质评价········································15
Ⅱ-7 地震烈度···········································16
III、本工程特点、难点·····································17
IV、工程目标··············································18
IV-1质量目标············································18
IV-2安全目标············································18
IV-3工期目标············································18
IV-4环境保护目标········································19
Ⅳ-5造价目标············································19
1、人员、物资、机械设备配置情况及进场方式·················19
1.1设备、人员及施工组织机构详细情况介绍·················19
1.2设备、人员、材料运至现场的方式························20
2、施工准备···············································23
2.1驻地建设·············································24
2.2技术准备·············································32
2.3物资设备准备·········································34
2.4施工总体平面布置·····································34
2.5施工现场管理机构设置·································34
3、总体施工方案及施工准备工作·····························34
3.1总体施工方案·········································34
3.1.1路基土石方工程·····································34
3.1.2特殊路基工程·······································35
3.1.3涵洞工程···········································36
3.1.4隧道工程··········································36
3.1.5防护及排水工程·····································36
3.2施工准备工作·········································37
3.2.1开工前准备········