基坑工程设计与施工阶段若干问题探讨-岩土工程专业论文.docxVIP

基坑工程设计与施工阶段若干问题探讨-岩土工程专业论文.docx

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
ABSTRACTABSTRACT ABSTRACT ABSTRACT This thesis discusses the scheme selection and optimization,calculation of earth pressure and environmental influence of foundation pit.The selection of foundation pit excavation scheme is a multi—objective decision,which including confirming decision objective,working out alternative decisions and decision choosing.This thesis uses fuzzing mathematics decision—making theory to choose scheme;basing on design variable,objective function and constraint conditions,figures out mathematic model,and uses genetic evolution to optimize the scheme;according to the correlation of the earth pressure of enclosing construction and the deformation, figures out a non—linear earth pressure model which considered deformation effect, analyzes and estimates the concepts and conditions of water-soil united method and water-soil respectively;the dominating affect factors of foundation pit environmental effect are dewatering and deformation of enclosing structure,as the result of the immaturity of the enclosing structure deformation theory,this paper introduces the conceptual design to solve the environmental problem. Secongdly,this thesis discusses some problems about earth excavation, monitoring and crash program in foundation pit engineering.Basing on theological property analyzes the deformation during excavation,applies space-time effect to control the stability and deformation of foundation pit;demonstrates the necessity and importance in monitoring;crash program is an important item during excavation, which should be determined before excavating;a lot of uncertainties and the fuzzfy of the geologic condition,the predictability of engineering design,the variance of climatic condition and the cooperation of multi—corporation make it is very important to dynamic management,this thesis gives the argument about it through all example. Key words:foundation engineering, scheme choosing,environmental effect,earth pressue,enclosing design,stability, defo

您可能关注的文档

文档评论(0)

peili2018 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档