- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
英文原文
Research and development on cutting scale machine in the coalmine shaft
REN Bao-cai
Abstract:The deposit scale in the coal mine shaft usually causes serious accidents, such as making rope broken, cage seized or dropped. To solve this kind of problems, the research of the cutting scale mechanism was made, and a new type of removal scale equipment was made with using imported hard alloy material. The cutting experiment and actual cutting show that it can adapt to abominable condition in the shaft, such as narrow space, wet and excessive shaft crevice water and so on, and can work safely and reliably, and has high cutting scale efficiency. It can also cut out the deposit scale in the circular section of shaft.
Key words:deposit scale in shaft wall, cutting scale, cutting mechanism, cutting scale machine.
In the service shaft of Tongye Coal Mine of Anyang Mining Bureau, the shaft crevice water is excessive, and in water there is a large of lime stone deposit, which leads to large scale on the shaft wall through long time, which is 300 mm in thickness. The initial design diameter of the shaft is D=3.2 m,the clearance between the cage and the shaft wall is 200mm, but now the projecting part of cage has been embedded in the scale about 100 mm, which is shown in Fig.1. Once in a winter, the shaft crevice water frozen and seized the elevating cage, this made the winding rope broken suddenly, and led the cage to drop into the bottom of shaft, which caused large economic losses. The scale in the shaft wall is always one of the hard problems puzzling this coal mine. The study about the scale is more than 100 years, and great progress have been made [1–4],which is presented mainly in two different aspects.The first is to control and slow the scale to form,and study the principle how the scale is formed and the dynamic model that the scale is separated out and sunk[5–8] and so on. Using chemical method,clear out the scale by pretreatment and intenerate to water, such as addi
您可能关注的文档
- 瓦斯抽放在德国煤矿的高效运作外文文献翻译.doc
- 瓦斯的突出控制技术在澳大利亚的应用外文文献翻译.doc
- 微抛丸切削介绍毕业课程设计外文文献翻译、中英文翻译.doc
- 微通道注塑成型模具设计外文文献翻译、中英文翻译.doc
- 微型消声室的设计外文文献翻译、中英文翻译.doc
- 为慈善组织智能高速,高自动化变种硬币分类外文文献翻译、中英文翻译.doc
- 未来的小规模采矿-环境和社会经济的视角外文文献翻译.doc
- 温室窗帘和窗户通风设备的物理模型外文文献翻译、中英文翻译.doc
- 卧室用现代组合家具设计答辩PPT.pptx
- 卧室用现代组合家具设计开题报告及文献综述.doc
- 工会代表大会运行规则及十大制度解读.docx
- 法院合同法案例分析与学习笔记.docx
- 医疗急救口头医嘱管理流程制度.docx
- 幼儿园科学实验教学设计案例.docx
- 2025秋九年级英语全册Unit2Ithinkthatmooncakesaredelicious课时3SectionAGrammarFocus_4c习题课件新版人教新目标版.pptx
- 2025秋九年级英语全册Unit5WhataretheshirtsmadeofSectionA合作探究二课件新版人教新目标版.pptx
- 2025秋九年级英语全册Unit2Ithinkthatmooncakesaredelicious课时4SectionB1a_1d习题课件新版人教新目标版.pptx
- 2025秋九年级英语全册Unit1Howcanwebecomegoodlearners课时3SectionAGrammarFocus_4c习题课件新版人教新目标版.pptx
- 2025秋九年级英语全册Unit5Whataretheshirtsmadeof课时4SectionB1a_1e课件新版人教新目标版.pptx
- 2025秋九年级英语全册Unit3Couldyoupleasetellmewheretherestroomsare课时3SectionAGrammarFocus_4c课件新版人教新目标版.pptx
最近下载
- 不合格食品处置管理制度(食品公司标准版).docx VIP
- 2025海南三亚市中医院(考核)招聘员额制和事业编人员137人(第1号)笔试备考题库及答案解析.docx VIP
- 20以内连加口算练习题4000题 每页80题(141).docx VIP
- 侯柱峰-vasp计算晶体弹性常数.pdf VIP
- 高铁大桥道岔连续梁施工技术方案.docx VIP
- DBJ_T 15-101-2022 建筑结构荷载规范.docx VIP
- 普通化学习题集(参考).doc VIP
- 道岔梁专项施工方案道岔梁专项施工方案.doc VIP
- 华容道解法(带图解超完整直接打印效果).pdf VIP
- 小区电梯维保项目 投标方案(技术方案).doc VIP
原创力文档


文档评论(0)