《EDAW之伦敦奥运遗产规划》.pptVIP

  • 0
  • 0
  • 约1.58千字
  • 约 22页
  • 2020-10-21 发布于天津
  • 举报
EDAW之伦敦奥运遗产规划 What happens when the games have ended and the crowds have gone home? 奥运后…… Fade to disuse and dilapidation, or be lifted to new levels? 废弃或进阶? Legacy planning, integral to the early and ongoing strategic and master planning process as well as the implementation, determines this difference — greatly increasing the value derived from the investment in hosting a major international sporting event. 遗产规划必不可少。 区位概况 The Lower Lea Valley covers an area of around 1,500 acres, runs north-south from Lea Bridge Road to the River Thames and is situated just three miles from central London. The Lower Lea Valley Central London London 利亚山谷地区现状 Londons Lower Lea Valley ——one of U.K.s poorest areas. Choked with infrastructure and utilities. Degraded green and blue space. 发展落后,人地关系紧张。 再生计划 以社区发展为重点,借此契机重新发展现有的社区并建立新社区; 释放公共空间,拥有绿化与水域空间。 奥运城规划 整个奥运基地占地 15hm2 。 5hm2的公园(150年来欧洲规模最大的市区公园)。 9 个主要场馆(体育场、水上中心、曲棍球场和赛车场,以及4个多功能场地)。 9 000栋选手住宿单位(在赛后将成为平价住房)。 10 条运输系统。 7 000个工作机会(而赛后,还将有 11 000 个新的工作机会。政府将为当地居民提供就职培训,以适应新增的工作机会)。 规划内容 (1)专注于社区的营造。 (2)恢复河道,重建人水关系。 (3)增加密度,灵活使用。 (4)重新建立城市连接网络。 (5)增加城市绿化。 (6)地区再生,提高生活品质。 (7)建构人性化的城市。 河道系统 Reclaiming the Rivers. 恢复河道,扶助地区独特性开发,重建人与河流、水道之间的动态关系。 交通网络 Reconnecting the City. 重新建立城市连接网络,建立战略性的交通基础设施,在原来几乎没有内部交通运输系统的情况下,把不同地区重新连接在一起,为伦敦东部提供良好的发展条件。 内部交通网络 连接外部的交通网络示意 Central London The Lower Lea Valley 绿化系统 Greening the City. 增加城市绿化,在东部地区公园和泰晤士河地区,将公园与其他绿带整合为一体; 利用水道和地形优势,将地区特色、水资源管理和环境生态系统融合; 鼓励绿色地区的动态使用,建立一个完整网络的绿化结构,合并原有的开放空间、动植物栖息地,实现多元化的地域层次。 理念-功能分区 奥运留下的 马赛克拼接 功能分区 Sectorization 全局鸟瞰图 更详细的鸟瞰图 效果图一 效果图二

文档评论(0)

1亿VIP精品文档

相关文档