- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
桥梁施工组织设计
目录
第一章 编制说明 ············································································· 3·
1.1 工程概况 ················································································ 3·
1.2 编制依据 ················································································ 3·
1.3 编制原则 ················································································ 3·
第二章 项目管理机构配备情况 ······························································ 4·
一、现场组织管理机构(如下图) ······················································ 4·
二、各部门职责 ·············································································· 5·
第三章 施工准备及资源配备计划 ······················································ 7·
3.1 施工前的准备工作 ······································································ 7·
3.2 设备、人员动员周期和设备、人员、材料运到施工现场的方法 ·············· 8·
3.3 设备、人员、材料运到施工现场的方法 ··········································· 9·
第四章 施工总平面布置及临时用地表 ····················································· 9·
第五章 主要工程项目的施工方案、方法与技术措施 ···································10
5.1 施工准备工作 ············································································10
5.2 桩基工程 ··················································································10
5.3 柱式墩台、盖梁工程 ···································································18
5.4 预应力钢筋砼 T 梁预制施工 ··························································22
5.5 预应力钢筋砼 T 梁安装施工 ···············
原创力文档


文档评论(0)