guidance document1998-12-23 b a a q m d inspection procedure g d f(指导document1998-12-23 b问m d g d f检验过程).doc
- 1、本文档共6页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
Inspection Procedure GDF-03
Gasoline Dispensing Facilities
PRESSURE INTEGRITY PERFORMANCE vERIFICATION
FOR VACUUM ASSIST SYSTEMS
[Squeeze Bulb Test]
1. PURPOSE
1.1 Air ingestion caused by a leaking nozzle or vapor check valve degrades vapor collection during vehicle refueling and increases pressure-related fugitive emissions by promoting gasoline evaporation in the vapor recovery system. This inspection procedure provides a method to determine if “bootless” Phase II vacuum assist vapor recovery nozzles or remote vapor check valves allow air ingestion into the vapor recovery system. The procedure is applicable to those bootless systems that utilize a remote vapor check valve; it is not applicable to systems that utilize nozzles with built-in check valves. The procedure is designed to produce virtually no testing-related emissions. When used in conjunction with Inspection Procedure GDF-01 (Bag Test) this procedure can isolate certain sources of air leakage.
2. Principle
2.1 A compression fitting, or Air-to-Liquid (A/L) adaptor is placed over the nozzle spout, isolating all of the vapor collection holes. A squeeze bulb is used to create a vacuum of fifteen (15.0) plus or minus one ((1.0) inches H2O at the vapor collection holes on the nozzle spout. A toggle valve is closed, isolating the squeeze bulb and eliminating it as a possible decay source. A pressure/vacuum gauge, connected to the test assembly is used to determine the rate of vacuum decay. If the vacuum decreases by more than one (1.0) inch H2O in ten (10) seconds, there is an unacceptable leak between the nozzle spout and the remote vapor check valve, inclusive.
3. Interferences
3.1 If the nozzle spout is deformed such that the vapor collection ports cannot be isolated, the inspection procedure will be biased to indicate noncompliance.
3.2 This procedure cannot be used on passive systems such as a balance system.
4. EQUIPMENT
4.1 Pressure Integrity Assembly. Use a compre
您可能关注的文档
- g l o s s a r y o f s h i p p i n g t e r m s(g l o s s r y o f s h i p p i n g t e r m s).doc
- g r a d u a t e s c h o o l o f p u b l i c a n d i n t e r n a t i o n a l a f f a i r s(g r d u t e s c h o o l o f p u b l我c n d n t e r n t i o n l f f ir s).doc
- g r o c e r y p r i c e s f o r m a r q u e s a s a n d t u a m o t u s(g r o c e r y p r i f c e s o r m a r问u e s s n d t u m o t u s).doc
- g r o u n d t r a i n i n g01-03________ notes(g r o u n d t r我n n g01-03________笔记).doc
- g a s- p h a s e a d s o r p t i o n- pomona college(g s - p h s e d s o r p t i o n -波莫纳大学).doc
- g u i d e l i n e s f o r p r o v i d e r s f o r t h e e s t a b l i s h m e n t(我d e l n g u e s f p r o v r f i d e r s o t h e e s t b l i s h m e n t).doc
- g u i d e t o t h e m o b i l i t y a n d h a r d s h i p s c h e m e(g u i d e t o t h e m o b我l t y n d h a r d s h i p s c h e m e).doc
- gas pressure1atm=760torr(mm hg)=14(气体pressure1atm = 760托(毫米汞柱)= 14).doc
- general descriptionof production, properties,and usesof(一般起生产、属性和机会).doc
- general o s h a compliance checklist- hub spot(通用o s h合规检查表-中心位置).doc
最近下载
- 创建三级医院知识培训幻灯片.ppt VIP
- 哈尔滨工业大学制造系统自动化大作业——搬运机械手运动控制系统设计规划.pdf
- 2024年四川省成都市中考物理真题卷(含答案与解析).pdf VIP
- 2024年湖南华容县事业单位招聘专业技术人员历年公开引进高层次人才和急需紧缺人才笔试参考题库(共500题)答案详解版.docx
- 地灾工程施工质量验收用表.doc
- 《我们奇妙的世界》作业设计.docx VIP
- 燃气公司生产安全标准化手册资料.pdf VIP
- 土方运输方案完整版.docx
- 化工原理课程设计-丙烯丙烷精馏塔及其辅助设备的工艺设计.pdf
- 闽南师范大学2022-2023学年《植物生理学》期末考试试卷(A卷)含参考答案.docx
文档评论(0)