- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
DEALER SERVICE BULLETIN
Number: DSB 09-0022 Date: 4/809 Supersedes: DSB 07-0049 Title: 90% Furnace Heat Exchanger
Inspection Procedure
PRODUCT CATEGORY:
90% furnaces
MODELS AFFECTED:
320A, 321A, 340A, 340M, 345M, 350A, 350M, 351D, 352A, 352M, 355A, 355B, 355C,
355M, 398A, 398B, 399A
58SX, SXA, SXB, SXC, DX, DXA, DXC, VCA, VUA, MCA, MCB, MXA, MXB, MSA,
UVB, MVP, MVB, MVC, MTA, MTB
490A, PG9MAA, PG9MAB
SITUATION:
There are several furnace heat exchanger inspection methodologies that have been used in the field. Improper or inadequate furnace heat exchanger inspection techniques can result in the misdiagnosis of a heat exchanger failure when a failure has not occurred or is not imminent.
SOLUTION:
Attached is the official Carrier / Bryant / Payne 90% Furnace Heat Exchanger Inspection Procedure.
This procedure should be utilized to properly diagnose a heat exchanger failure once preliminary
service and troubleshooting techniques indicate the heat exchanger is suspected to have failed. This
bulletin may also be used as a reference to verify the furnace is installed properly. The maintenance
items section can be used to identify any existing or future service related issues.
This inspection procedure details significant installation, set-up, and maintenance items that can
impact furnace operation, combustion characteristics, and heat exchanger performance and
reliability. In general, if an initial check of combustion performance as detailed in Section 2 of this
procedure yields CO levels in the vent of 200 ppm or less, no further examination or inspection of the
heat exchanger is required. Installation, set-up, and maintenance items should still be reviewed
and corrected to resolve any remaining furnace operational concerns. An excess air measurement
can also help in diagnosis of heat exchanger failure. The combustion check procedure included in
this document details additional steps to include t
您可能关注的文档
- 食品安全政策——n c c存档.doc
- 食品质量、safetyas affectedby动物饲料.doc
- 使用定位beaconsfor被动的导航系统.doc
- 水果juicesand水果糖浆——byington.doc
- 虽然这些——cengage学习.doc
- 所有演员间(上- downor底部.doc
- 谭恩美——两种.doc
- 通用商业计划——会计与记账技巧.doc
- 微软文字处理软件.doc
- 问题1,clarifyhardware presentationlogistics.doc
- 我比较studyof e c76and c57 - v我r g n t r n s f o r m e r c o r p.doc
- 项目总结报告边缘球员+ version589 a6 x.doc
- 细胞呼吸实验室- c o s e e西方.doc
- 新员工新员工清单.doc
- 性能taskof静物paintingof最喜欢的对象.doc
- 研究进展——庆应义塾大学.doc
- 液体(= liquidsorgases)-科罗拉多大学博尔德.doc
- 一个e u g i d e specificationsfor siedle intercom3000.doc
- 一个l m11.00 patch15自述——专家的性能.doc
- 一个n t s d l l w e v e l t w o y e l l o w.doc
文档评论(0)