ppt课件-penetration level impactof wind powered generationto power(渗透水平impactof风动力generationto权力).pptVIP

ppt课件-penetration level impactof wind powered generationto power(渗透水平impactof风动力generationto权力).ppt

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
* * * * When applying to wind generation forecast, the neural network will be used to construct the optimal transformation between the affecting variable such as wind speed to the output which is the wind power generation. The manufacture generally provide the turbine power curve to represent the characteristic of each wind turbine. The simplest method to project the output power is to use this power curve. This is called a direct transformation. The validity of the approach subjects to many constraint, which is likely not be be valid in real operation of wind farm. For example, wind speed is not necessary measured at the same height which the power curve was generated. So it’s difficult to get a good result from applying he curve. Also if the information for each individual wind turbine is not available, then power curve cannot be applied. What ANN does in this case is to develop the optimum transfer function based on the presentation of recorded historical data. For each level of wind speed, the wind power generation from a wind farm may varied in a certain range. After training, ANN will develop the curve that best match this information which later can be used to project wind power forecast in the future. * * * * * * * * * * * * * * * * * * Non Coincident Peak Wind Generation in Texas Source: ERCOT Unit Commitment Scheduling Market clearing price for energy and total wind generation on February 22, 2005 Price Dips Market clearing price for energy (MCPE) and total wind generation on April 27, 2007. Variability Increases Operating Costs Committing unneeded generation Scheduling unneeded generation Allocating extra load-following capability Violation of system performance criteria (For example, spinning reserve) Requirement of reactive power supply for induction-type generator These will increase the Ancillary Service Costs Voltage Fluctuation Buses % Real Power deliver by wind Generator 100% 75% 50% 25% IG operate at 0.85 leading PF, Fix Qc=70.5 MVAR (Unity P

您可能关注的文档

文档评论(0)

heti94575 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档