- 32
- 0
- 约3.17万字
- 约 62页
- 2017-06-04 发布于浙江
- 举报
* * * 16 * Edward Tong@2008 copy reserved Jinan University * _________ The tool used to assist in making project trade-offs between schedule, budget, and performance objectives is called a?cA.?Responsibility matrixB.?Work breakdown structureC.?Project priority matrixD.?Work packageE.?Criterion matrix 17 * Edward Tong@2008 copy reserved Jinan University * The lowest element in the hierarchical breakdown of the WBS is?bA.?A deliverableB.?A work packageC.?A cost accountD.?A lowest sub deliverableE.?An object 18 * Edward Tong@2008 copy reserved Jinan University * The highest element in the hierarchical breakdown of the WBS is?eA.?A work packageB.?Sub deliverablesC.?A cost accountD.?Major deliverablesE.?The project 19 * Edward Tong@2008 copy reserved Jinan University * All of the following are true about work packages except?cA.?Consume resourcesB.?Assigned to only one managerC.?Have medium to long durationD.?Definitive starts and stops datesE.?All of these are true 20 * Edward Tong@2008 copy reserved Jinan University * All of the following are usually included in a work package except?eA.?What will be done?B.?The time needed to complete the work.C.?A single person who is responsible for its completion.D.?All the costs for the work package.E.?All of these are included in a work package. 21 * Edward Tong@2008 copy reserved Jinan University * ? The integration of project work packages within the organizations management structure is known as b?A.?Responsibility matrixB.?Organization breakdown structureC.?Work breakdown structureD.?Priority matrixE.?Process breakdown structure 22 * Edward Tong@2008 copy reserved Jinan University * ? The final step in the creation of a Work Breakdown Structure is to?aA.?Code the WBS for trackingB.?Assign the cost account to a managerC.?Assign the work package to a managerD.?Develop the responsibility matrixE.?All of
您可能关注的文档
最近下载
- 中医基础理论:气一元论.ppt VIP
- DB61_T 2002-2025 窄轨旅游轨道交通施工技术规范.pdf VIP
- DB61_T 2004-2025 水性环氧改性微表处施工技术规范.pdf VIP
- 北京市装配式建筑项目预制率和装配率计算说明及示例.ppt VIP
- 火灾报警控制器简单操作.doc VIP
- DB61_T 2012-2025 沥青路面一体化就地热再生施工技术规范.pdf VIP
- DB61_T 2013-2025 沥青路面半刚性基层微裂均质化处治施工技术规范.pdf VIP
- 单件流培训.ppt VIP
- 隧道工程应急处置方案(3篇).docx VIP
- 海关面试题及答案.doc VIP
原创力文档

文档评论(0)