- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
建筑开槽(Construction slot)
建筑开槽(Construction slot)
The description is not clear enough. I have a bottom in my mind
Requirements for construction conditions:
1. Prior to excavation, the land shall be cleared and disposed of in the area under the construction plan according to the requirements of the construction plan.
2. The positioning control line (pile), standard level pile and gray line size of the building or structure of the building or structure must be inspected and qualified; And complete the procedure of pre-inspection.
3. Adequate lighting facilities should be used during night construction; A clear sign should be set in the dangerous lot, and the excavation sequence should be arranged reasonably, so as to prevent the wrong digging or digging.
4. When excavating underground water level foundation pits and pipes, the underground water level shall be reduced according to the local engineering geological data. Generally, it should be reduced to 0.5m below the excavation surface before excavation can be made.
5. The roads, Bridges and unloading facilities of the construction machinery entering the site shall be inspected in advance, and the preparation work shall be strengthened or widened if necessary.
6. Choose the earth moving machinery, should according to the topography of the construction area and the operation conditions, the type and thickness of soil, total quantity and time limit for a project comprehensive consideration, to exert the efficiency of construction machinery to determine, good construction scheme.
7. The layout of the operation route of the construction area shall be determined according to the size of the work area, mechanical performance, distance and topographic relief.
8. It shall be equipped with manual operation in the areas where the mechanical construction is unable to operate and the slope of the slope and the bottom of the cleaning groove.
Familiar with drawing and technical background.
Process flow:
The order and slope of the excavation are determined
D
您可能关注的文档
- 初中物理试题5(Middle school physics test 5).doc
- 初中美术知识(Junior high art knowledge).doc
- 初中英语语法(入门,绝对给力)(Junior high school English grammar (introduction, absolute power)).doc
- 初二上册一部分(声光材料)物理知识点(First part (audio and optical materials) physical knowledge points).doc
- 初二上册物理复习资料(The first two copies of physics review materials).doc
- 初中语文中考模拟试卷(Middle school Chinese test paper).doc
- 初二下学期期末考试物理模拟试卷(The final examination paper for the final examination of the next semester).doc
- 初二化学下学期知识点(Second semester of chemistry).doc
- 初二寒假作业的答案(The answer to the first two winter vacation homework).doc
- 初二历史知识点(First two historical knowledge points).doc
- 建筑师的欧洲视角(The architect's European perspective).doc
- 建筑CN(Building CN).doc
- 建筑声环境概论(Introduction to architectural acoustic environment).doc
- 建筑施工技术(Construction technique).doc
- 建筑材料(Building materials).doc
- 建筑测量(Construction survey).doc
- 建筑构造考点解析(Analysis of building construction test points).doc
- 建筑电气与智能化专业人才培养方案(Building electrical and intellectualized professional personnel training program).doc
- 建筑电气常用规范目录(Building electrical common specification directory).doc
- 建筑环境作业(Building environment operation).doc
文档评论(0)