下穿既有线K803+860桥梁道路施工方案(Construction plan of K803+860 Bridge Road under existing line).docVIP

下穿既有线K803+860桥梁道路施工方案(Construction plan of K803+860 Bridge Road under existing line).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
下穿既有线K803+860桥梁道路施工方案(Construction plan of K803+860 Bridge Road under existing line) Construction plan of K803+860 Bridge Road under existing line I. General Situation of the project Both the Hunan Chongqing line in K803+860 bridge pier beam rubble set 3 hole span of 8 meters of a rural road, passing under the bridge; the size of the bridge structure by the field measured 2.87 meters in height, span 5.8m. Because of the need for new Lanzhou Chongqing railway construction, concrete construction vehicles must be along both the rural roads, but considering the bridge height cannot meet the traffic requirements, so it is necessary to bridge the road slope, deep processing, to meet the traffic conditions. Two, construction plan In order to ensure the safety of the existing bridge, set up high grade concrete retaining wall two pier of bridge adjacent the door, then this section of the road slope, deep, finally used 40cm thick high grade concrete pavement. Concrete retaining wall length 6m, height 1.5m, width 1.0m; rural road slope 15 degrees, line length 10m, width 3.8m. See Figure 1 Schematic diagram of reinforcement concrete bridge pier 1. Preparation 1.1 field investigation Organize experienced construction personnel on the site of a comprehensive investigation, focusing on the line to find out the direction and location of buried pipelines, and may affect the construction safety of underground pipelines, reported to the relevant departments to change, protection. 1.2 sign the safety agreement The reinforcement plan feasible before construction, submitted to the public works section for approval, and quanke signed a security agreement with the railway section. 2, construction methods 2.1 measuring lofting The total station instrument is used for the location of fixed points and the layout of the setting line, and the construction range of white lime is sprinkled. Then the level of the original ground is measured and controlled by a level, and the control line of the ex

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档