全现浇大模板工程施工工艺(Construction technology of full cast in place large formwork).doc

全现浇大模板工程施工工艺(Construction technology of full cast in place large formwork).doc

  1. 1、本文档共10页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
全现浇大模板工程施工工艺(Construction technology of full cast in place large formwork)

全现浇大模板工程施工工艺(Construction technology of full cast in place large formwork) Bufenbuqi, not determined to learn. Qu Zequan is straight. There are horses, and maxima. A thousand li is often there, but Bole seldom. Noisy as mixed shells, pearls falling into a jade plate. The process standard is applicable to the whole cast in place large scale formwork of ceramsite, pumice lightweight aggregate and ordinary sand lightweight aggregate concrete. 2.1 materials and main equipment: 2.1.1 lightweight aggregate: Pumice: maximum particle size should not be greater than 20mm, not allowed to contain more than two times the maximum particle size. Grading requirements for the 5mm through the screen is not more than 90%, through the 10mm screen for 30% to 70%; through the 200mm mesh is not greater than 10%. Void ratio is not greater than 50%, water absorption ratio of 1H is not greater than 25%, mud content is not more than 2%, loose density, cylinder pressure strength meets the design requirements. Ceramsite: the same as the above requirements, and shall not mix with inclusions or clay blocks. 2.1.2 sand: medium sand or coarse sand, containing mud, when the concrete strength grade is C10 ~ C30, not more than 5%, when the concrete strength grade is greater than C30, not more than 3%. 2.1.3 cement: No. 325, No. 425 slag Portland cement or ordinary Portland cement. 2.1.4 admixture: product quality certification, dosage must be determined by the laboratory, technical performance compliance with the relevant standards. 2.1.5 main equipment: mixer, bucket, trolleys, scales, pervibrator, shovel, iron plate, wood trowel, Xiaoping spade, small spoon, buckets, water pipes, rubber additive metering vessel. 2.2 operating conditions: The 2.2.l approach raw materials including cement and light aggregate and admixture when the inspection certificate, the technical performance indicators must meet the requirements, and shall reinspect the lightweight aggregate, each for a group of 2003 (less than

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档