- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
财务管理与财务分析运营管理课件9PPT
12 The process starts with a card for the first product. ? 2007 Pearson Education Lean Systems Chapter 9 How Lean Systems fits the Operations Management Philosophy Operations As a Competitive Weapon Operations Strategy Project Management Process Strategy Process Analysis Process Performance and Quality Constraint Management Process Layout Lean Systems Supply Chain Strategy Location Inventory Management Forecasting Sales and Operations Planning Resource Planning Scheduling Lean Systems Lean systems are operations systems that maximize the value added by each of a company’s activities by paring unnecessary resources and delays from them. (video) Just-in-time (JIT) philosophy The belief that waste can be eliminated by cutting unnecessary capacity or inventory and removing non-value-added activities in operations. JIT system: A system that organizes the resources, information flows, and decision rules that enable a firm to realize the benefits of JIT principles. Pull method of work flow Quality at the source Small lot sizes Uniform workstation loads Standardized components work methods Close supplier ties Flexible workforce Line flows Automation Preventive maintenance Characteristics of Lean Systems Push and Pull Systems of Work Flow Push method: A method in which production of the item begins in advance of customer needs. Example: A buffet where food is prepared in advance. Pull Method: A method in which customer demand activates production of the service or item. Example: A restaurant where food is only prepared when orders are placed. Lean systems use the pull method of work flow. Pull method of materials flow Quality at the source Small lot sizes Uniform workstation loads Standardized components work methods Close supplier ties Flexible workforce Line flows Automation Preventive maintenance Characteristics of Lean Systems Small Lot Sizes Lot:?A quantity of items that are processed together. Setup: The group of activities needed to change or readjust a
您可能关注的文档
最近下载
- 中招英语质量分析.pptx VIP
- 北师大版六年级上册数学知识点汇总(精华版).docx
- 课程思政在小学英语教学中的实施效果教学研究课题报告.docx
- 《语言障碍的康复》课件.ppt VIP
- 2025年中国小家电未来发展趋势分析及投资规划建议研究报告.docx VIP
- 语言与言语训练的方法课件.ppt VIP
- 统编版2024道德与法治七年级上册 教材单元思考与行动解答示例.pptx
- DB52T 780—2012贵州省白酒工业旅游示范点评定规范.pdf VIP
- 2025年医院招聘考试公共基础知识历年试题及答案解析(4).docx VIP
- (2025秋新版)北师大版三年级数学上册《铅笔有多长》PPT课件.pptx VIP
文档评论(0)