Maintenance and Operations Plumbing维护和运营的管道.pptVIP

Maintenance and Operations Plumbing维护和运营的管道.ppt

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
Maintenance and Operations Plumbing维护和运营的管道

Snow Management De-Icing Plan Snow Management De-Icing Plan Plumbing John Arent Architectural Energy Corporation Plumbing Plumbing Maintenance Plan (Guideline PM1) Fixtures (Guideline PM2) Water Heaters (Guideline PM3) Domestic Water System (Guideline PM4) Water Waste Management (Guideline PM5) Steam and Gas Systems (Guideline PM6) Plumbing Maintenance Plan (Guideline PM1) Identify system requirements. Obtain manuals for all parts. Establish expected life of equipment and required maintenance tasks. Identify staffing levels and budget requirements. Identify a record keeping procedure and work order process. Fixtures (Guideline PM2) Check piping and seals monthly. Verify that shut-off valves and backflow devices are operational. Check seals and valves. Run plumbed and self-contained eyewash and shower equipment monthly. Provide training for metering and low-flow devices. Keep outdoor faucets, drains, and sprinklers in good condition. Zero-Water Consumption Urinals Can save 40,000 gallons annually. Reduces water and sewage charges. Eliminates flush valve or sensor repairs. Increases hygiene. More effective protection against backflow of sewer gases over standard P-traps. Easy-to-replace cartridge lasts up to two months. Eliminates odor. Reduces potential for vandalism. Water Heaters (Guideline PM3) Flush tanks at least annually. Check pressure gauges/relief valves four times/year. For glass-lined tanks, replace sacrificial anodes every 2-3 years, or if 6 in. of the core wire is exposed. Check combustion chamber and flue. Limit hot water to maximum 140°F (separate heating in kitchens). Verify that mixing valves deliver a maximum of 110°F water to fixtures. Install timers on water heaters. Domestic Water System (Guideline PM4) Perform preventive maintenance. Prevent scaling with routine water quality testing. Check domestic hot water circulator pumps. Maintain spare supply for valves and controls. Install shut-off valves to allow for problem isolation. Check faucets

您可能关注的文档

文档评论(0)

wuyoujun92 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档