- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
反褶积方法在桩基低应变检测数据分析中的应用研究结构工程专业论文
关键词 桩基检测;低应变;缺陷;有限元;反褶积
Abstract
In recent years, along with the high-rise constructions development, pile has become one kind of important foundation form. Because the pile can transmit the superstructure load in-depth stable soil layer, reducing the foundation subsidence greatly, therefore the pile foundation is used massively in projects of housing, high-rise construction, heavy workshop, and bridge. The pile foundation project is the concealed work, so the quality of it directly relates construction security. Once there has the accident, the reinforcement processes is very difficult. Therefore, the pile testing has become an important link of pile foundation project. But many pouring of concrete pile which made by machineries Cheng Kong often has defect which will affect the supporting capacity and the superstructure security, even causes pile to lose the bearing capacity if serious. Above all, the pile foundation integrity testing is a concerned issue of the engineering.
The low strain reflection method is the most common measurement used by detecting the integrity of pile at present. The method of analysis material mainly depends on the direct-viewing resolution from time and frequency domain, the qualitative appraisal, so its precision and the reliability can’t meet the project needs in many situations. The detect of multi-defects is also an difficulty. The research now are almost on the qulity if defects, little on the quatity of defects. In order to improve these problems, the paper uses the method of numerical simulation and unifies the reality engineering data to validate the result of model. The research content and results mainly include the following several aspects:
For the well simulation of defects pile, first we should check the effect of the method. It selects 10 groupes integrity models by the uniform design method to be the representation to validate the deconvolution method applicable scope of pile length and pile diameter in pile integrity t
您可能关注的文档
- 初中数学学困生的成因及改进对策的研究-学科教学(数学)专业论文.docx
- 初中数学学案教学现状的调查分析-课程与教学论专业论文.docx
- 初中数学小班化教学中关于数学交流的研究学科教学(数学)专业论文.docx
- 初中数学实验教材(苏科版)使用情况的调查与分析-教育专业论文.docx
- 初中数学实验教学探索-学科教学·数学专业论文.docx
- 初中数学应用题教学策略研究-教育学专业论文.docx
- 初中数学思想方法间的关联分析与教学研究-教学(数学)专业论文.docx
- 初中数学微课程应用研究-现代教育技术专业论文.docx
- 初中数学情境教学策略-教育专业论文.docx
- 初中数学情境教学策略研究-教育专业论文.docx
- 反规避法律问题研究———反倾销背景下国际法专业论文.docx
- 反译法在维汉翻译中运用-语言学及应用语言学专业论文.docx
- 反诘类语气副词研究-语言学及应用语言学专业论文.docx
- 反语的属性同一性解析-英语语言文学专业论文.docx
- 反语的认知语用研究-外国语言学及应用语言学专业论文.docx
- 反资本弱化的法律分析-电气工程专业论文.docx
- 反走样技术和滤波技术在地图可视化表达中的应用-摄影测量与遥感专业论文.docx
- 反转螺旋薄壁管件液压胀形仿真及其优化-机械制造与自动化专业论文.docx
- 反逆向工程技术研究-控制理论与控制工程专业论文.docx
- 反重力铸造设备过程控制及人机交互界面设计-材料加工工程专业论文.docx
原创力文档


文档评论(0)