高产气井管汇压力分析及安全控制-机械电子工程专业论文.docxVIP

高产气井管汇压力分析及安全控制-机械电子工程专业论文.docx

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
高产气井管汇压力分析及安全控制-机械电子工程专业论文

Subject:Pressure Subject:Pressure Anlysis of High Production Gas Wells and Security Measures Speciality:Mechanical and Electronic Engineering Name:Wang Lei(signature) Instructor:Dou Yihua(signature ABSTRACT During rdgh production gas well testing process,for the pressure of gas reservoir is often higher than the normal static water pressure even some reservoir is super high pressure reseⅣoir.Therefore,oilfield need use of higher loading capacity of equipment,Technology of Or}timization Ground Process,Switching Well Technology and Chokes Technology to resistance high pressure and corrosion to ensure the safty of manifold.On one hand,the underground tubing suffers various types of stress.On the other hand,natural gas pipelines continue to be corrosion with the gas flow in pipelines.Tubing wall thickness is thinning and intensity decreased.Tubing often bursts or crowded under the pressure of gas in the pipe.Meanwhile as high wellhead pressure,the phenomenons of the ground chokes are often lost chokes seal and chokes damaged by high speed gas.Manifold system security is seriously threatened.In order to provide the basic data for tubing stress analysis and insure salty.This article studies the pressure distribution of underground tubin洳while,calculations the ehokes pressure distribution for analysis damage reason for chokes and turbing to improve the system. This article writes for high pressure gas wells under the consideration of gas compression and propIosed one.dimensional calculation method for chocks.Because of the short structure of c110kes,calculation model ignore the energy loss of the natural gas flowing through chokes and calculated by assuming adiabatic.The result verified by using finite element method FLUENT to be evidence.The result proves the accuracy of this method Can meet the engineering requirements.Second,consider the natural gas water and the kinetic energy factor, calculated pressure distribution of pipelin

您可能关注的文档

文档评论(0)

131****9843 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档