接龙铁矿尾矿堆积坝的稳定性分析评价与初步设计-矿业工程专业论文.docxVIP

接龙铁矿尾矿堆积坝的稳定性分析评价与初步设计-矿业工程专业论文.docx

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
ABSTRACT In this paper, the geologic conditions of JieLong iron ore engineering have been discussed particularly based on geologic reconnaissance. On the basis of experiments and laboratory tests, the characters and stability about rock engineering of gangue dam have been studied using Sweden arc method. Based on research results and on a preliminary design of JieLong iron ore. Through research, the main conclusions as follows: JieLong iron ore is new tailings field belonged to the hilly terrain strongly cutting,branched development of a V-type Muchonggou,and Valley area on both sides of the exposed bedrock slope. thick layer groove,continuous rock distribution,and a hard-rock. Although the dam site near three groups of X shear fracture, but fissures short extension. can be eliminated or under exposed situation dealt with grouting project, rock on the whole structure of middle-level stability. On the other hand,venues and the surrounding buildings have been built for several decades has proved that the use of, no wall tension, Instability and other undesirable phenomenon. JieLong iron ore tailings sites simple geological structure, natural slope stability. Within the framework of the tailings area through no fault activities, impermeable surface widespread distribution of the clay layer, there is no leakage. Development of the reservoir area of vegetation, mountain slope stability.venues do not found landslides, mud-rock flows, such as adverse geological cave. No venue of active faults, site stability, geological structure, geomorphological features, geotechnical conditions for the construction of the tailings meet engineering requirements. Field experiments and laboratory test results show that, venues for the silty clay-permeable layer, local distribution of the fill-and-weathered rock is a high-permeability layer, and medium weathered bedrock of aquitard Reasonable dam type JieLong iron ore tailings dam, tailings dam in the dam axis position, that is the most di

您可能关注的文档

文档评论(0)

peili2018 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档