- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
英文原文
Numerical modelling of longwall mining and stability analysis of the gates in a coal mine
Mahdi Shabanimashcool *, CharlieC.Li
Department of Geology and Mineral Resources Engineer ing, Norwegian University of Science and Technology (NTNU), Trondheim, Norway
Abstract: This paper presents a novel numerical approach to simulate the longwall mining in detail, aiming to investigate the stability of gates and the loading process to rock bolts. The study site is the Svea Nord coalmine in Svalbard. In the proposed approach, progressive cave-in and fracturing of the roof strata, consolidation of the cave-in materials and stress changes are simulated in detail. The results of the simulations are used to analyse the loading process of the rock bolts in the gates. The numerical model is calibrated with the measurement data. The simulations reveal that the stability of the gates and the loading to the rock bolts are closely related to the width of the chain pillars. With slender pillars, shear displacements along weak inter layers and bedding planes results in heavy loading to the rock bolts. Therefore, the locations of weakness zones should be taken into account for rock bolt design. The proposed numerical approach can be used to find an optimal combination of the dimension of the chain pillars and the rock reinforcement in the gates.
Keywords : Longwall mining; Numerical modeling;Coalmine Cave-in of the roof strata;Rockbolt ;Chainpillar
Introduction
The stability of gates is essential to ensure the safety of longwall mines. In longwall mines, stope voids are filled by cave- in roof rocks. Roof cave- in causes rock fracturing and yielding as well as stress concentrations in the surrounding ro ck mass. Gates and chain pillars between longwall mining panels are subjected to a complex loading process throughout their service life. Roof bolting is one of the major measures for stabilising gates. Obviously, loading to the rock bolts is caused by the longwall mini
您可能关注的文档
- 基于WebService的虚拟实验系统集成的研究与设计外文文献翻译、中英文翻译.doc
- 基于单片机的汽车倒车防撞系统设计.docx
- 基于电子驻车制动系统的驻车制动磨合技术外文文献翻译、中英文翻译.doc
- 基于富集有限元方法的全锚固灌浆锚杆模型外文文献翻译.doc
- 基于慧鱼模型的智能清洗机器人设计外文文献翻译、中英文翻译.doc
- 基于积木式概念的组合家具设计研究外文文献翻译、中英文翻译.doc
- 基于计算机视觉系统对苹果表面的缺陷探测外文文献翻译、中英文翻译.doc
- 基于矩杆的高空作业平台车基座框架加速寿命试验外文文献翻译、中英文翻译.doc
- 基于模糊可靠性理论的液压锚杆钻机的电液进料系统的研究外文文献翻译、中英文翻译.doc
- 基于信息熵的涡旋压缩机的振动信号分析外文文献翻译、中英文翻译.doc
文档评论(0)