- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
十年同学聚会感言:同学聚会感言
there? After ignition, bustion should focus its attention on what?
Reducing boiler hot loss measures? DC-what are the main characterists of
the boiler? Boiler after Bao Biwen how? when shutdown to control drum
wall temperature difference? From a run standpoint, what are the main
measures to reduce coal consumption for power supply? Talk about how to
control the water level? Generator after splitting, 6KV why to promptly
eit the standby power switch? Why the current transformer secondary side
in the operation are not allowed to open? Why synchronous generator
ecitation circuit of the degaussing switch can be changed into a lively
breaker? Generator step-up process, why the rotor and stator currents to
monitor? Why are rotor one point ground prone to 2nd after ground? Try
380V discussed follog the grounding of auiliary power system, wiring for
three-phase five-limb terminal of PT secondary voltage change? Generator
inplete phase operation principle is what? Yn,d11 (Y0/-11) connection of
generator-transformer systems, generator open-phase running any help?
Why to install 100 stator grounding protection for large generator? Why
does not allow running secondary short circuit? Generator ecitation,
ecited, what is the of the overecitation limit? Generator loss of
ecitation in the running, what is the impact on the system and the
generator itself? Anti-cuozhong on the prevention of ecitation system of
generator caused by fault what damage? try discussing what are the
measures of improving power system dynam stability? What is a switching
operation of the electral equipment? main content switching operation of
power plants and power systems are there? Try discussing malignant
electr misoperation, whh misuse personal, most of the equipment? Switch
第 1 页 共 16 页
serve power fast cutting deve in several ways? in the alternate to the
State, the standby
您可能关注的文档
最近下载
- 终末消毒护理ppt.pdf VIP
- 实用日语(下)(南昌大学)中国大学MOOC慕课章节测验答案(课程ID:1003721006).pdf
- 单位物业管理服务方案投标文件(技术方案).pdf
- 医院信息系统(HIS)软件基本功能规范A.pdf VIP
- 电大一网一《网络安全技术》形考任务三(实验7、8、9,三选一,权重25%,需辅导教师评阅)作业3.doc VIP
- 2025中信证券融资测试题及答案.docx
- 河北省卫生系列高级专业技术职称申报评审条件(护理类).pdf VIP
- 电大一网一《网络安全技术》形考任务一(实验1、2、3,三选一,权重25%,需辅导教师评阅)作业1.doc VIP
- 〖生物〗生态系统的结构和功能课件-2025-2026学年生物八年级上册(新教材人教版).pptx VIP
- 医院信息系统基本功能规范.pdf VIP
原创力文档


文档评论(0)