钢筋技术交底2(Rebar technology at the bottom 2).docVIP

钢筋技术交底2(Rebar technology at the bottom 2).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
钢筋技术交底2(Rebar technology at the bottom 2)

钢筋技术交底2(Rebar technology at the bottom 2) I. construction preparation: 1, according to the construction drawings, and the blue prints.the design specification requirements, make the reinforcement, the team in advance put forward all kinds of specifications, level of steel raw material plan, the competent reinforcement date project house bugle call master audit confirmation, project material department organization partial approach. 2. After the entrance of the rebar, the mechanical properties of the samples shall be tested and tested in a timely manner. 3, construction machines and tools preparation: steel breaking machine, bending machine, butt welding machine, welding machine, steel electroslag pressure welding and straight thread mechanical connection set of silk machine installation in place, such as checking mechanical equipment are in good condition. And hang the equipment operating rules at the mechanical equipment. Ii. Rebar straightening and processing: 1, the engineering level Ⅰ reinforced straightening straightening machine. 2. Cutting of steel bar: the cutting machine can cut the steel bar less than 40mm in diameter, and cut it according to the approved reinforcement list. The distance between blade and impact blade can be guaranteed when cutting off. The steel bar with diameter 20mm shall be equal to 1-2mm, and the steel bar with diameter of 20 mm shall be left about 3mm to ensure the lower material length of the steel bar. Ⅰ level of this project reinforced and mechanical connection reinforced with grinding wheel cutting machine cutting, other reinforcing steel cutting machine is adopted to cut off. The bending of steel bar: The cut steel bar is bent according to the single part of the reinforcement bar, the layer, the part and the parts. Ⅰ grade steel using artificial operation wave wrench to steel forming, Ⅰ level reinforced end to 180 ° hook, the arc bending diameter not less than 2.5 times the diameter of the steel and should not be less than the

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档