隧道及地下工程防水堵漏方法(Waterproof and leak stoppage method for tunnel and underground engineering).docVIP

隧道及地下工程防水堵漏方法(Waterproof and leak stoppage method for tunnel and underground engineering).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
隧道及地下工程防水堵漏方法(Waterproof and leak stoppage method for tunnel and underground engineering) Waterproof and leak stoppage method for tunnel and underground engineering Water leakage in underground engineering control technology in underground engineering including industrial and civil construction of the basement and protective engineering, mountain cavern, subway, tunnel etc.. In underground engineering, because of poor design, construction, material construction, improper handling of bad quality is not good, ground subsidence and man-made or natural disasters caused by engineering change near the hydrogeological factors such as lead, under construction or completed projects, Water Leakage occur infiltration phenomenon is relatively common. Without timely management, it will affect the progress of the project, the use of function, and even affect the safety of the structure of the project. Hazards of seepage water in underground engineering: 1, the underground engineering seepage Water Leakage, calcium hydroxide will make the reinforced concrete are dissolved, the pH value of small, easily lead to corrosion in reinforced concrete structures, and will accelerate the alkali aggregate reaction of concrete structure, which affects the safety of the structure, shorten the service life of engineering. 2, underground project seepage water, will lose its use function. Such as staff long-term work in a humid environment or living prone radon pollution will affect the health, and even lost the ability to work; if used for storage of goods, will make the material moisture and rot or failure. 3, underground project leakage, must use mechanical drainage and the use of dehumidifier or hygroscopic desiccant all the time, will cause energy loss, cost soaring. 4, the leakage of water conveyance tunnel will not only drain the water quantity and raise the cost of water conveyance, but also make the soil around the tunnel collapse and form a cavity, which will endanger the structural saf

您可能关注的文档

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档