TMC公司精密光学镜头精益生产项目的实施-工业工程专业论文.docxVIP

TMC公司精密光学镜头精益生产项目的实施-工业工程专业论文.docx

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
TMC公司精密光学镜头精益生产项目的实施-工业工程专业论文

THE LEAN PROJECT IMPLEMENT OF THE PRECIOUS OPTICAL MANUFACTURING IN THE TMC COMPANY ABSTRACT TMC is a joint-venture enterprise, the main product is LCD enhance film and optical lens used in projector TV(PTV). The paper is focus on the conversion of the production mode in projector optical lens workshop. Latest year, especially from 2004, as the marketing demand of PTV descended, it impacted the TMC, a main vendor, seriously. In order to reduce the manufacturing cost, face up to the challenge of competition and the market, we decide to implement the lean production mode in manufacturing and logistic department first of all. The paper stand by the lean anticipation, based on several latest managing theory such as the lean manufacturing and IE. we collect the current production date of PTV workshop, draw the current value stream map(VSM), then identify the no valuable added items and the items need to improve by means of valuable analysis technique., then we draw the future value stream map i.e. the improved map. Basic on that, we implement a series of lean production blueprint. Firstly, we optimize the working procedure flow of PTV workshop, making use of the principle ECRS(Eliminate, Combine, Rearrange, Simple) and the technique of 5W2H. simplify the operating step, eliminate no value added conveying, then reduce the remaining time of WIP. Much no valued added operation has been cancelled by means of the procedure flow improvement. For example, the total operating time drop to 60.4% than previous. Secondly, we analyze the logistic path in workshop and improve the layout. Eliminate and Combine the production line, improve the operating design, the new method replaced the solid transportation as a plane one.so eliminate the flection of production line and transportation radically. on the other hand, tighten the equipment layout. By that, the production areas has decrease to 40% than before improvement, Which would be a steady basic to implement the lean thinking of th

您可能关注的文档

文档评论(0)

peili2018 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档