网站大量收购独家精品文档,联系QQ:2885784924

地铁风道施工对周围环境影响分析及安全风险评估-桥梁与隧道工程专业论文.docx

地铁风道施工对周围环境影响分析及安全风险评估-桥梁与隧道工程专业论文.docx

  1. 1、本文档共82页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
地铁风道施工对周围环境影响分析及安全风险评估-桥梁与隧道工程专业论文

西安建筑科技大学硕士学位论文 西安建筑科技大学硕士学位论文 Analysis of Impact on the Environment by Air Channel Construction and Assessment of Construction Risk Specialty: Bridge and Tunnel Engineering Master: Tang YinJing Instructor: Prof. Huo RunKe ABSTRACT As the contradiction intensified between the increasing urban population and the limited bearing capacity of transportation, the urban subway gets gradually popular by city builders. This paper is mainly studied the stress and deformation of the supporting structure of no. 1 air channel at Shuang Jing station of the no. 7 subway in Beijing, and contained the influence to the surface and existing air channel. Numerical simulation was combined with field monitoring in analysis, and evaluating the security risks is added. The main contents of this paper are as follows: Two kinds of construction methods of CRD and PBA is adopted by using finite difference method to no. 1 air channel, and the calculation results of displacement are compared. The maximum surface sedimentation is 10.25 mm and 12.30 mm by two methods respectively. It is found that both of settlement regularities of the surface were curved of horizontal sedimentation conform the Peck by two construction schemes, while the longitudinal surface subsidence rule were processed to present their periodic changes. The first part of the excavation will cause greater degree of surface subsidence. The supporting stress of two kinds construction schemes by finite difference methods. Supporting structure is given priority to with compressive stress when CRD construction method is used, and middle rails and the side wall in the compressive stress is larger, 6.86MPa. While the tensile stress in the bottom plate is smaller. Supporting structure maximum tensile stress is produced 6.44MPa when PBA construction method is used, and maximum compressive stress is produced 6.44MPa. The comprehensive comparison plan CRD is superior to the conclusion of the PBA. The four monitoring cross section was take

您可能关注的文档

文档评论(0)

peili2018 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档