egprs终端射频一致性测试研究与实现信号与信息处理专业毕业论文.docxVIP

  • 2
  • 0
  • 约4.98万字
  • 约 58页
  • 2018-12-22 发布于福建
  • 举报

egprs终端射频一致性测试研究与实现信号与信息处理专业毕业论文.docx

egprs终端射频一致性测试研究与实现信号与信息处理专业毕业论文

EGPRS EGPRS TERMINAL RF CoNFoRAIANCE TEST RE SEARC H AND REALIZE ABSTRACT Terminal conformance test iS the vital 1ink in the whole terminal industrial chain.It is the test in order to ensure all aspects of mobile terminal performance in conformity with the relevant specification requirements under the process defined by relevant specification before the terminal enter the market and end.users. Terminal RF confcIrmance test iS the very important part of the terminal conformance test.It can be divided into two parts:certifical:ion test and RD test.Certification test is the mandatory test.according with the 3 GPP terminal conformance test specification.within the framework of GCF and PTCIm through the third.party certification labs authorized by GCF and PTCRB using the designated test platform to complete.RD test is the test that terminal manufacturers refer to the 3GPP terminal RF conformance test specification and verify terminal’S RF performance compliance with specification requirements in the RD stage.RD RF test requires to use the lOW.cost.high reliability and high flexibility test platform to complete. In order to meet the requirements of terminal I江conformance test in the stage of RD test,the paper researches carefully to 3 GPP terminal RF conformance test specifications,focus on EGPRS terminal,refers to the composition and work principle of GCF and PTCRB designated test platform,designs and realize the EGPRS RF terminal conformance test platform.On the hardware level.the platform iS compose of the common RF test device such as radio frequency integrated test set.signal sources and fading simulator t.and use the switching and control unit which is compose of filters and electronically controlled switch to make these instruments integrated into one platform.On the software level.the platform builds the package of remote control interface commands,compile the test case through calling the package.and complete the EGPRS IU terminals conformance test and receive

您可能关注的文档

文档评论(0)

1亿VIP精品文档

相关文档