- 5
- 0
- 约8.85千字
- 约 53页
- 2022-03-29 发布于重庆
- 举报
Lead then through a description of the steps they could take to create a PM program. For the 3rd and 4th points use a flip chart and as a large group discussion ask how we can determine tasks frequency. Responses should be: manufacturer’s suggestions experience information on similar equipment information from other operations For the scheduling, refer them to equipment PM schedule. Suggest adding a column that says “Frequency” rather than shading boxes. (or table of dept vs time) Discuss list and why each item, then refer them to the Equipment Inventory list form. PURPOSE: to ensure that pr
您可能关注的文档
最近下载
- 钢结构冬季施工方案 .doc VIP
- 大体积混凝土浇筑施工方案.pdf VIP
- 标准图集-17CK119-CC-I双面彩钢板复合风管制作与安装-参考图集.pdf VIP
- 民航安全检查全套教学课件.pptx
- danfoss 丹佛斯 S45中载开式泵(含K2泵).pdf VIP
- 05S2 给水工程标准图集.pdf VIP
- 学堂在线 明·园境赏析:明代11佳园 章节测试答案.docx VIP
- 2025年设备监理师职业道德投诉与处理机制专题试卷及解析.pdf VIP
- 2025年房地产经纪人房地产咨询顾问的周期分析服务专题试卷及解析.pdf VIP
- 2025年互联网营销师CDP平台OneID体系构建与管理专题试卷及解析.pdf VIP
原创力文档

文档评论(0)