- 4
- 0
- 约1.51万字
- 约 12页
- 2017-08-03 发布于河南
- 举报
浅谈排水管道工程的质量控制要点(Discussion on quality control points of drainage pipeline project)
Published in 2009-3-18 14:32:18, using props, small, medium, big landlord
[Abstract] the article from the entire process, drainage pipeline construction including: pipe procurement, measurement line, trench excavation, flat base seat, security management, interface, inspection wells closed water test and back filling the 9 steps of quality control, some common quality problems or problems in drainage pipeline construction the analysis, and puts forward the corresponding quality control measures.
Key words: drainage pipeline engineering; pipe purchasing; measuring and laying out; quality control
With the development of urbanization process, the pace of infrastructure construction is speeding up, and with the increasing demand for environmental protection, the proportion of drainage pipeline project in infrastructure construction is also increasing. Drainage pipeline engineering and peoples production and life, its function is good or bad, related to the vital interests of thousands of households, the relationship between ecological problems of city flood and groundwater and soil contaminated. Therefore, strengthening the quality control of the drainage pipeline project is of great significance for eliminating the quality defects of the project and ensuring the quality of the drainage pipeline project.
First, the quality control of drainage pipe
(a) common quality problems;
The poor quality of pipe, cracks or partial loose concrete, compressive strength, anti permeability ability, easy to be crushed or seepage: diameter deviation, an easy wrong port tube.
(two) quality control measures;
1. pay attention to pipe material inspection. Requirements of the construction unit selection of regular manufacturers of pipes, and check the pipe factory certificate and inspection mechanical test reports and other information is complete.
2., pay attention to the appearance of pipe inspection. When th
您可能关注的文档
- 新课改背景下的教学行为反思(Reflection on teaching behavior in the context of new curriculum reform).doc
- 新课改背景下高中语文复习教学浅议(On the review teaching of Chinese in high school under the background of new curriculum reform).doc
- 新课改的数学教学(Mathematics teaching in New Curriculum Reform).doc
- 新课改的思考(Reflections on the new curriculum reform).doc
- 新课改下高中物理学中的探究学模式初探(The inquiry model of physics in Senior High School under the new curriculum reform).doc
- 新课改下的教师职业道德观(Teachers' professional ethics under the new curriculum reform).doc
- 新居落成对联2(Completion of new homes couplet 2).doc
- 新课改下如何体现学生主体地位(How to embody the subject status of students under the new curriculum reform).doc
- 新课改下语文教学方法的探讨(Discussion on Chinese teaching method under the new curriculum reform).doc
- 新课改中如何抓好少先队工作(How to do a good job of young pioneers in the new curriculum reform).doc
- 广东省广州省实验中学教育集团2025-2026学年八年级上学期期中考试物理试题(解析版).docx
- 广东省广州大学附属中学2025-2026学年八年级上学期奥班期中物理试题(解析版).docx
- 广东省广州市第八十六中学2025-2026学年八年级上学期期中物理试题(含答案).docx
- 广东省广州市第八十九中学2025-2026学年八年级上学期期中考试物理试题(解析版).docx
- 广东省广州市第二中学2025-2026学年八年级上学期期中考试物理试题(含答案).docx
- 广东省广州市第八十六中学2025-2026学年八年级上学期期中物理试题(解析版).docx
- 广东省广州市第八十九中学2025-2026学年八年级上学期期中考试物理试题(含答案).docx
- 广东省广州市第二中学2025-2026学年八年级上学期期中考试物理试题(解析版).docx
- 2026《中国人寿上海分公司营销员培训体系优化研究》18000字.docx
- 《生物探究性实验教学》中小学教师资格模拟试题.docx
最近下载
- 虹口区2009学年第一学期高三英语期终教学质量监控测试卷(附答案).doc VIP
- CNAS-CL01-2018检验和校准实验室能力认可准则培训教材.ppt
- GMP标准简介(程克文)课件.pptx VIP
- 2025年中国大唐集团有限公司校园招聘笔试参考题库附带答案详解.docx
- 民族药四数九里香.pptx VIP
- 2022年四川省雅安市中考数学试卷真题(附答案详解)文字可复制.pdf
- 2026年春季北师大版(2024)三年级下册数学教学计划(含进度表).docx VIP
- 党支部2025年度组织生活会个人对照在学习贯彻党的创新理论、在加强党性锤炼、在联系服务群众、在发挥先锋模范作用、在改作风树新风存在的不足.docx VIP
- 职业生涯规划与就业创业指导 第3版 第4章 生涯目标与职业决策.ppt VIP
- 2026年Shopee店铺运营实战手册.pptx
原创力文档

文档评论(0)