从接单到出货整个服装外贸的工作流程(From the order to the shipment, the whole garment foreign trade workflow).docVIP

  • 33
  • 0
  • 约1.71万字
  • 约 13页
  • 2017-10-05 发布于河南
  • 举报

从接单到出货整个服装外贸的工作流程(From the order to the shipment, the whole garment foreign trade workflow).doc

从接单到出货整个服装外贸的工作流程(From the order to the shipment, the whole garment foreign trade workflow)

从接单到出货整个服装外贸的工作流程(From the order to the shipment, the whole garment foreign trade workflow) A process sheet 1, the first process of text processing, translated into chinese. 2 reference and control in the process of single check (mainly refers to the old customers), to study whether there are new changes or there is something wrong, look at have no special requirements, the craft list indicates an unidentified place in a timely manner to communicate with the customer, if the customer does not understand the place according to the operation requirements of conventional processing orders. 3 to process single checked: (1) the first is the main ingredient, such as the type of fabric, yarn, structure, weight and color (especially special color, such as gray); (2) materials, including zipper (whether specific, such as YKK), rope, buckle, eye, lace, elastic band, the woven cloth (should pay attention to whether need dyeing and knitting machine) rib, main label, washing mark, logo, brand decoration etc.. 4 the control technology of single study English embroidery and other treatment, such as fabric mercerizing, washing, dyeing etc. (about HTP in the order of the British embroidery no detailed information, even in the original color, printing proofing stamp size is also no clear indication, only one customer requirements: good. Although the customer gave the right to the factory, but also brought some difficulties to the factory, to speculate about the customers attitude, he should take the initiative to innovation, design some things. In this respect, we should adapt ourselves to this requirement as soon as possible. Two, nuclear price After carefully study the technology of single, arrange the price, then fill in to check the price lists, fill in the single nuclear price must be clear, seriously, after the hand who checks not good close to primary responsibility; recommend a factory merchandiser best finishing fabric, yarn, weight, width of a table so, after the nuclear pr

您可能关注的文档

文档评论(0)

1亿VIP精品文档

相关文档