中建一公司工程变更后工程结算管理问题分析-analysis of project settlement management after engineering change in china construction first company.docxVIP

中建一公司工程变更后工程结算管理问题分析-analysis of project settlement management after engineering change in china construction first company.docx

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
中建一公司工程变更后工程结算管理问题分析-analysis of project settlement management after engineering change in china construction first company

哈尔滨工业大学工程硕士学位论文 哈尔滨工业大学工程硕士学位论文 - - II - Abstract With the country economy and the continuous development of society, construction enterprises are facing increasingly fierce market competition, the construction enterprises in the management process to achieve continuous innovation, advance with the times, especially in the engineering settlement management, must always be around this one core to cost, however, as the project cycle during construction, engineering change almost inevitable, but because most of the construction enterprise to project change attention degree is insufficient, the engineering change has affected the project settlement are important factors, great damage of the construction ent erprise project income. Specifically, the majority of domestic construction enterprises in engineering change settlement management lack of perfect management system, the lack of engineering change management and operation mode of settlement monitoring; concept is relatively backward, innovation of the poor, so that these enterprises and changes related to the settlement management got bogged down. Therefore, this article to the construction of a company as an example, discusses the project change after the settlement management problems. Based on the related domestic and foreign about project settlement and engineering change,the project changes to clearing the impact analysis; then deep into Construction First Building Corporation Limited , the company s current engineering change settlement management present situation analysis, pointed out the problems, and discuss the causes of those problems; this basis, based on engineering change agent in one company to build engineering change billing management system construction, analyzes its key factors, including organizational management, target management and process management, and considering the engineering change project operation flow analysis and cause decomposition, obtains the corresponding financial an d no

您可能关注的文档

文档评论(0)

peili2018 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档