网站大量收购独家精品文档,联系QQ:2885784924

道路升级改造 施工方案 英文版.doc

  1. 1、本文档共21页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
道路升级改造 施工方案 英文版

1. General The scope of works in the project includes: (a) General (b) Setting out (c) Drainage Works (Including lining the trapezoidal drains with concrete or masonry) (d) Earthworks ( Grading, Forming , Embankment construction and Re-gravelling) (e) Road Paving and Surface sealing (f) Concrete works (g) Road Furniture The scope of works include upgrading of the gravel road to bituminous surface dressing and drainage works. We carried out the site inspection conducted by the Client and we are very familiar with the site conditions as relates to these works. 2. Project Administration We shall provide, maintain and subsequently remove temporary office, sanitary arrangements, store, workshop and everything necessary for the completion of the works. The site office will be provided with all the necessary facilities required including on- site test equipment to test compaction density and survey equipment to ensure that the works done are to specification. At mobilization, we will move all the necessary equipment, personnel and materials to site. This process will take only a month from the date of the commencement order. We shall employ female staff as well and shall be paid no less than the government gazette requirement for wages. The Consortium will provide a Contract Manager on the project who will make sure that all resources are available to the Project Staff for timely execution of the works. We shall have a Site Agent/Engineer whose duties shall include but not restricted to; programming of the works, progressing and co-ordinating all the works. He will also be responsible for the following: ? All of the Contractor’s design (where appropriate) ? Construction of all road and drainage works ? Ensuring that all works complied with relevant standard and environment requirement. All correspondence and communication between the Employer and the Contractor, the Engineer and the Contractor shall be directed through the Contract Manager. Our proposed project orga

文档评论(0)

小教资源库 + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档