瓯江水电站厂房枢纽及吊车梁结构计算 明书 最后版.docVIP

瓯江水电站厂房枢纽及吊车梁结构计算 明书 最后版.doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
瓯江水电站厂房枢纽及吊车梁结构计算 明书 最后版

完整设计图纸请联系本人,参见豆丁备注。/lzj781219 摘 要 瓯江水电站即紧水滩电站在瓯江上游干流梯级开发的第一级水电站,工程以发电为主,兼顾航运、放木及防洪等综合利用要求。瓯江流域处浙东南沿海山区,属于年调节水库。 本次设计的水库死水位为264m,正常蓄水位为285m。根据历史洪水资料设计洪水(P=0.1%),水库的设计洪水位291m。校核洪水位(P=0.01%)为293m。 水电站装机容量为20万kW,四台机组单机5.0万kW。水轮机型为为HL-220-LJ-330坝后地面式厂房,开关站布置在左岸。主厂房宽20m,长74.6m进场公路布置在右岸。副厂房是为保证水电站正常运行需要,设置在主厂房上游侧。主要布置各种机电辅助设备、房间、生产间和必要生活设施房间。 电站建成后主要担任华东电网调峰并供电丽水、温州将使丽、温两地区通过220千伏输电线路联系,形成浙南电力系统。此外,电站的建设,将带动当地工农业发展,为当地居民创造就业条件,改善当地社会经济,促进当地以及周围地区的发展。 Abstract Oujiang plant (JinSshuiTan plant)is the first step hydropower station in upper reaches of the Oujiang River. The main purpose of the project is to generate electricity, but also considered the woods of the shipping and protect floods. Oujiang River basin located in the southeast area which is near the say in Zheijang Province, and the plant is a year adjust reservoir This design determined the dead water level is 264m, the normal water level is 284m. According to the historical flood date (P=0.1%), the designed flood level is 291m, the proofread level is 293m (P=0.01%). According to the characteristics of geology and topography, gravity dam was chosen. The total electric capacity is 200,000kW,and four generates whose capacity is 50,000kW was installed. The type of the turbine is HL-220-LJ-330. The power house is situated behind dam.The width of the main power house is 20 m,the length is 74.6m. All kinds of auxiliary equipment and other kinds of rooms assemble in deputy house. When the plant is constructed, it regulates the electric network of the southeast of China, and it also supple electricity to Lishui and Wenzhou. It will connect the Lishui and Wenzhou electricity nets. At last a electricity net will be formed. Additionally, the construction of the hydropower station will spur on the development of the industry and agricultures in the area. It will also spur on the job improvement of the economic condition . 目录 摘 要 1 Abstract 2 第一章 基本设计资料 5 1.1 地理位置 5 1.2 水文与气候 5 1.3 地形与地质 7 1.3.1 水库区工程地质 7 1.3.2 坝址地质 8

文档评论(0)

2017meng + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档