网站大量收购独家精品文档,联系QQ:2885784924

百色导流隧洞工程实施阶段投资控制的探讨与分析-discussion and analysis on investment control of baise diversion tunnel project during implementation stage.docx

百色导流隧洞工程实施阶段投资控制的探讨与分析-discussion and analysis on investment control of baise diversion tunnel project during implementation stage.docx

  1. 1、本文档共61页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
百色导流隧洞工程实施阶段投资控制的探讨与分析-discussion and analysis on investment control of baise diversion tunnel project during implementation stage

摘要本文从建设项目监理工程师的角度出发,对百色水利枢纽导流 隧洞工程实施阶段的投资控制进行了探讨和分析,提出了一套有效 解决投资大、工期长及风险较高的工程项目的投资控制的方法思 路。本文从工程项目投资控制的基本理论和国际国内的建设监理状 况入手,以百色导流隧洞工程项目为载体,重点分析了项目实施阶 段的投资控制目标确定及分解、投资控制过程、工期一费用权衡优化和工程变更及索赔方面的内容。文中用赢值法对投资偏差进行了监 羚测,用横道图法对投资偏差进行了分析;在处理工期与投资优化时 采用线性规划和整数规划综合分析的方法,结合工程实际对工程变 更和施工索赔的控制方法等内容做了较全面的介绍。关键词:导流隧洞工程实施阶段 投资控制 线性和整数规划工程变更施工索赔AbstractsFrom the view of the supervising engineer of the construction project,this paper explored and analyzed the investment control during the operation stage of the diversion tunnels of Baise Hydraulic Project, and raised a set of methods and ideas of investment control toeffectively resolve the problems of excessive investment and long duration as well as high risks in the projects.This PaDer started with the basic theory of investment control ofprojects and the construction supervision status of both internationally and domestically,and with the Baise diversion tunnels as an example,it analyzed in particular the establishment and breakdown of the objectives of investment control during the operation stage of theproject,and the investment control process,duration—cost balancing optimization,and the project variations and claims.The investment deviation was monitored by means ofEarned Value in the paper,and was analyzed with charts;the integrative analysis method of linear programming and integral programming wasadopted when handling the duration and investment optimization,and acomprehensive introduction was made to the control method of the project variations and construction claims with the combination of the practice of the project.Key words:projects of diversion tunnels implementation stage investment control linear and integral programming project variations construction claims独创性声明本人声明所呈交的学位论文是本人在导师指导下进行的研究工作和取得的 研究成果,除了文中特别加以标注和致谢之处外,论文中不包含其他人已经发表 或撰写过的研究成果,也不包含为获得盘鲞盘鲎或其他教育机构的学位或证书而使用过的材料。与我一同工作的同志对本研究所做的任何贡献均已在论文中作了明确的说明并表示了谢意。学位论文作者签名:签字同期:年月日学位论文版权使用授权书本学位论文作者完全了解墨壅盘堂有关保留、使用学位论文的规定。 特授权叁生盘堂可以将学位论文的全部或部分内容编入有关数据库进行检 索,并采用影印、缩印或扫