考虑压力资源约束的轮胎硫化车间能效优化方法研究-机械工程专业毕业论文.docxVIP

考虑压力资源约束的轮胎硫化车间能效优化方法研究-机械工程专业毕业论文.docx

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
广东工业大学硕士学位论文粒子群算法 广东工业大学硕士学位论文 粒子群算法 万方数据 AbstractAbstract Abstract Abstract Tire manufacturing industry is a high energy consumption manufacturing industry There are several characteristics in it,such as wide range ofproducts,frequent switching o fproduct orders,a wide variety of resource mediums as well as labor-intensive.There is great significance in quality assurance and reduction of energy consumption during the process of rmking tkes In this process,due to multiple energy medium,various kinds o f specifications, products switching,the energy of Vulcanizer is quite different under different conditions In addition,according to the technical requirements of curing process,Vulcanizer need some vapor pressure to hold pressure to provide process environment for tire curing process when it in the three different states of normal curing,stop—preheating and hollow turn waiting during product switching process.What is difficult for the problem in this paper is that the steam generated by boiler is a certain everyday,and the number of opening Vulcanizers are unknown under the determined total pressure.What’S more,the tire curing process is constrained by steam pressure under different machining conditions. How to determine the number of opening Vulcanizers and the steam haput in different condition,and finally it converted into how to arrange to process different tire products in Vulcanizer with different parameters.There is a direct impact on the energy consumotion ofthe whole tire production whether the scheduling plan is good.Therefore, this paper mainly research the production scheduling problem in curing workshop,and construct energy consumption model considering the constraint of pressure resources. 皿硷main research contents are as f0110WS: (1)According to analyzing energy flow distribution in tire manufacturing process and the factors of energy consumption in the process of curing workshop,it is necessary to find the characteristics of tire manufacturing proce

您可能关注的文档

文档评论(0)

peili2018 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档