西青区津静复线雨污合建泵站工程建设的可行性分析-feasibility analysis of the construction of pumping station with rain and sewage on tianjin - nanjing double-track line in xiqing district.docxVIP

  • 17
  • 0
  • 约3.64万字
  • 约 61页
  • 2018-08-07 发布于上海
  • 举报

西青区津静复线雨污合建泵站工程建设的可行性分析-feasibility analysis of the construction of pumping station with rain and sewage on tianjin - nanjing double-track line in xiqing district.docx

西青区津静复线雨污合建泵站工程建设的可行性分析-feasibility analysis of the construction of pumping station with rain and sewage on tianjin - nanjing double-track line in xiqing district

Ab Abstract 万方数据 万方数据 submersible axial-flow pumps of Model 900QZB-50, with single flux=2056L/S, lift=8.1m ; For processing specificity of the location(close to the county government), this paper the designing scheme of full underground sewage pumping station, with automatic delivery mechanism and deodorization equipment, protecting the environment and economizing manpower. Flux of the sewage pumping station Q=2.2m3/s , To adopt 7 water pumps of Model 400WQ1600-10-756, 5 in use,2 standing by ,with flux=1600 m3/h, lift=8.5m. In addition, the architecture, structure, electrical and automatic control designing of this pumping station are presented afterwards. Finally, this paper refers to some other questions, including the environmental protect, the safety and health condition, fire prevention, energy saving, etc, putting forward specific requirements. Key wor ds: drainage pumping station; integrated storm water and sewage pumping station; process planning; feasibility study 3 目录 目录 目 录 摘要 ............................................................ 1 ABSTRACT ........................................................ 2 目 录 .......................................................... 4 第一章 绪 论 .................................................... 7 1.1 市政排水泵站的作用与分类 ................................... 7 1.2 国内外排水泵站概况 ......................................... 7 1.2.1 国外排水泵站概况 ...................................... 7 1.2.2 国内排水泵站概况 ....................................... 9 1.3 本文研究的内容 ........................................... 11 第二章 项目概述 ................................................ 12 2.1 工程项目背景 .............................................. 12 2.1.1 项目背景 .............................................. 12 2.1.2 工程建设必要性 ........................................ 12 2.1.3 研究范围 .............................................. 12 2.2 编制依据 .................................................. 13 2.2.1 编制依据 ...............................

您可能关注的文档

文档评论(0)

1亿VIP精品文档

相关文档