暨南大学《项目管理》Chapter 5 Estimating Project times and costs.pptVIP

  • 57
  • 0
  • 约3.11万字
  • 约 62页
  • 2017-06-04 发布于浙江
  • 举报

暨南大学《项目管理》Chapter 5 Estimating Project times and costs.ppt

* * 21 * Edward Tong@2008 copy reserved Jinan University * ? The accuracy of bottom-up estimates will typically be in the range of?e A.?Minus 50% to plus 50% B.?Minus 0% to plus 75% C.?Minus 20% to plus 60% D.?Minus 35% to plus 35% E.?Minus 10% to plus 30% 22 * Edward Tong@2008 copy reserved Jinan University * ? The cost to prepare bottom-up estimates will typically run how much more than the costs to prepare the top-down estimates?? c A.?About the same B.?About twice as much C.?About three times as much D.?About four times as much E.?About five times as much 23 * Edward Tong@2008 copy reserved Jinan University * Typical kinds of costs found in a project include?e A.?Direct costs B.?Project overhead costs C.?General and administrative costs D.?Only A and B are included E.?A, B, and C are all included 24 * Edward Tong@2008 copy reserved Jinan University * Project costs are typically viewed from all of the following except:?b A.?Scheduled B.?Sunk C.?Actual D.?Committed E.?All of these are correct 25 * Edward Tong@2008 copy reserved Jinan University * ?Which of the following would be considered a direct project cost??e A.?Labor B.?Materials C.?Equipment D.?Both A and B are direct costs E.?A, B, and C are all considered direct costs 26 * Edward Tong@2008 copy reserved Jinan University * Which of the following is not one of the recommended guidelines for developing useful work package estimates?? A.?Estimates should be made by those responsible for the work d B.?Use several people to estimate the same work C.?Estimates should be based on normal conditions D.?Estimates should include a normal level of contingency E.?Estimates should be independent of other projects 27 * Edward Tong@2008 copy reserved Jinan University * Companies like Boeing, Kodak, and IBM are using which of the following for improving the estimating process??d A.?Adjusting estimates based on individual forecasting

文档评论(0)

1亿VIP精品文档

相关文档